| Level 1 | Level 2 |
Power | Standard 120-volt outlet | Dedicated 240-volt circuit |
Speed | Adds a few miles of range per hour | Several times faster, typically a full overnight charge |
Installation | Plug in | Licensed electrician, circuit and often a permit |
Best for | Occasional or backup charging | Daily home charging |
Most drivers who commute daily choose a Level 2 charger installed in the garage or on an exterior wall.
EV charging is a continuous load, so the circuit is sized above the charger’s rating:
Charger | Typical circuit breaker |
32 amp | 40 amp |
40 amp | 50 amp |
48 amp | 60 amp |
We confirm the wire size, the breaker and the run length for your garage or driveway.
Cost depends on the charger, the distance from your panel to the charger, whether the panel needs work, indoor or outdoor mounting, trenching, and permit fees. We give a written estimate with the charger, the electrical work and any panel upgrade listed separately.
About rebates: the federal Section 30C charger tax credit ended for chargers placed in service after June 30, 2026. State and utility programs change, so we do not promise rebates. Ask us what is available for your address when you call.
California law gives many homeowners in HOAs and many tenants a path to install a charger, with conditions. Check with your association or landlord, and we can provide the electrical plan they will ask for.
Offices, retail centers and multi-unit properties often need several chargers and load management so they do not overload the service. We plan the capacity, the conduit and the permit. See commercial electrical services.
Fill out the quick form here on our site or call our Murrieta dispatch
line.
In most cases yes. A new 240-volt circuit typically needs an electrical permit and an inspection. We pull the permit and schedule the inspection.
Match the circuit to the charger: a 32 amp charger needs a 40 amp circuit, a 40 amp charger needs 50, and a 48 amp charger needs 60, because EV charging is a continuous load.
Not always. If your panel is 200 amps with open spaces, you may not. If it is full or small, a panel upgrade or load management may be needed. We check before we quote.
In most cases yes. Send us the model and we will confirm what the charger needs before scheduling.
Timing depends on the run from your panel to the charger and any panel work. We confirm it in your estimate.
Yes. We serve Murrieta, Temecula, Menifee, Lake Elsinore, Wildomar and Canyon Lake.